PRESENTATION
Faced
with the repeated requests of its clients and partners, ACOUSTIQUE CLAIRBOIS
TISSEYRE is making available to you its control of airport noise pollution,
control which derives from the experience acquired from numerous studies
in the field -Orly, Liège, Charleroi
-, as well as twenty
years of daily confrontation with concrete acoustic problems at airports.
The
most varied missions have been entrusted to ACOUSTIQUE CLAIRBOIS TISSEYRE
in the area of airport noise pollution : impact studies, metrological
assessments, projection studies, daily monitoring via a permanent metrological
network
…
-

PRINCIPAL
MISSIONS
I
– Characterising the site - Metrology
- Characterising
the site in its current situation with the help of large scale measuring
campaigns (30 points x 1 week for Liège, 18 at Charleroi, 10
at Villeneuve-Saint-Georges
) ;
- Interpretation
of the metrological results : differentiation of the sources within
a multi-source environment, " extraction " of aircraft in
order to obtain their specific noise pollution, establishment of an
acoustic inventory to be compared with the results of simulations ;
establishment of a distribution of the contribution of the different
forms of transport to the acoustic environment.
II
– Projection Calculations
-
Creation of the IT model of the site ;
- Establishing
various scenarios, according to fleet composition, the number of daily
movements, the presence or otherwise of night flights, the approach
and take-off routes taken
- Optimising
scenarios, taking account of the different charactersitics of each of
the aircraft, their climb profiles as well as their dispersion vis-a-vis
theoretical routes, motorisation
;
- Acoustic
impact studies of moving aircraft (taxi and parking) ;
- Establishment
of noise maps, showing the pollution in function of the chosen indicator
;
- Proposals
for improvement : optimising take-off routes, improvements on the ground,
accompanying and curative measures, setting up a permanent metrological
network enabling noise pollution to be managed on a daily basis

METROLOGY

Temporal trend over a week
|
Post- processing of metrological results: automatic
extraction of "aircraft" events
|
Temporal trend over a day
|

NOISE
MAPS

Maps of noise on the ground based on a chosen indicator
(here LDN)
|
IT
modeling
The trajectories of aircraft are modelled in three dimensions,
taking account of the load of the aircraft, of its specific climb
profile and its aircraft dispersion vis-à-vis the theoretical
trajectory, which enables different uses of the airport to be characterised. |
| All
the results can be visualised in the form of noise maps and/or maps
of the effectiveness of noise pollution reduction measures. The maps
are presented in the form of isolevel contours, colour maps
.The
impact of the various scenarios can be assessed in terms of the population
effected, thanks to the use of exhaustive surveys of the buildings
in the airport environment (up to 20 km, and more than 150,000 inhabitants) |

Optimising take-off "routes
|
|